Project
Meuse Lock Gate Renovation & Study
A full-width steel lock gate on the Meuse was refurbished in place, restoring watertight performance without interrupting river navigation.
Scroll to explore

Brussels (BE)
2023
Industrial Project
A vital link on the Meuse
The lock forms a critical link along the Meuse waterway, and any downtime directly affects river traffic. Our team carried out a full structural inspection, re-sealed the gate mechanism, and reinforced the concrete sill, all while keeping the shutdown window as short as possible.
Working within a narrow shutdown window
Scaffolding, dewatering, and the gate overhaul were sequenced tightly, so river traffic could resume on schedule, with daily coordination alongside the waterway operator.
Divers and riggers worked in short weather windows to lift the gate leaf for inspection, while temporary flow control kept the lock chamber usable for smaller craft throughout the works.
Handover and reopening
The lock reopened to full-size barge traffic on the agreed date, with a maintenance log and inspection schedule handed over to the waterway authority.
18m
Gate Span
Full-width steel lock gate refurbished without disrupting river traffic.
3 months
Timeline
Delivered ahead of the scheduled shutdown window.
0
Incidents
Zero safety incidents across the full renovation.
An insight into our work
Submit a project to our team
Send us your constraints and your deadline. We'll come back with a first technical read and a clear view of what the structure needs.
Subscribe to the newsletter
Occasional notes on structural design, Eurocode updates and the projects leaving our office. A few times a year, nothing more.